
INDIA · SINCE 1990 · ISO 9001:2015
Hotel Kitchen Equipment in Bangalore
Hotel kitchen equipment from our Bangalore workshop, planned for the main restaurant, banquet production, room service, pastry and washing. Cooking, cold storage and service stations are coordinated around the demands of a working hotel.
About Us
Hotel kitchen equipment made in Bangalore
Steelkraft manufactures hotel kitchen equipment in Bangalore for main kitchens, banquets, room service and supporting preparation areas. Our scope brings together heavy-duty cooking ranges, bulk cooking, refrigeration and washing equipment, with grade 304 stainless steel fabrication and installation coordinated by our own team around the hotel's menu, service demands and available space.
A hotel needs more than a longer restaurant cooking line. Our published hotel equipment guide separates the operation into main cooking, banquet, pastry, cold kitchen and washing sections. Planning these together matters because restaurant orders, room service and event production can place different demands on the same storage, preparation and cleaning areas.
The main cooking section supports a la carte orders and room service through extended shifts. Open-burner ranges, Chinese ranges, tandoors, griddles, fryers and salamanders cover different cooking methods. Under-counter refrigeration belongs close to preparation and cooking, keeping line ingredients accessible without making every order depend on a trip to the main cold room.
Banquet production changes the equipment balance. Large batches need bulk cooking and holding rather than only individual cooking positions. Tilting boiling pans, steam equipment and bain-marie counters support that work. The event operation should therefore appear explicitly in the equipment brief instead of being treated as spare capacity on the restaurant line.
Pastry and cold preparation also deserve space in the brief. The hotel guide treats these as distinct sections, not leftover worktops beside the burners. Mixers, ovens, refrigeration and clean preparation surfaces need to support their own tasks while remaining connected to storage and service. Discuss these requirements before the equipment schedule is finalised.
Washing must keep pace with the dining operation. Hood-type and conveyor dishwashers are available alongside pot-wash sinks and pre-rinse units. Surrounding landing tables, sorting racks and drainage form part of the wash area. We arrange the section so the return of soiled items does not cross the movement of cleaned equipment.
Budget the whole back-of-house rather than comparing a single range price with a complete installation. Our cost guide places hotel kitchens at ₹50 lakh to ₹2 crore, with scope varying by the operation. Banquet capacity, multiple restaurants, bakery provision and extensive cold rooms all affect which equipment belongs in the final itemised schedule.
Who We Build For
Which hotel service areas need separate equipment?
Hotel buyers need to know whether the proposed kitchen covers everyday restaurant demand as well as event production. Ask which duties share equipment, where bulk cooking happens, how cold storage connects to preparation, and how clean items return from washing. These questions make the layout and quotation easier to compare.
Main restaurant and room service
A shared production line must support different orders through long shifts. Match open burners, wok cooking, tandoors and finishing equipment to the menu, then position preparation and refrigerated ingredients around that work. The pass and service route belong in the layout discussion, not just the equipment purchase.
Banquet and event kitchens
Events concentrate demand into a serving window. Bulk boiling, steam cooking and hot holding need to be considered together, alongside the movement of food toward service. A banquet equipment list should explain how batches are cooked and held rather than simply adding more individual restaurant appliances.
Pastry, cold kitchen and wash-up
These supporting sections determine whether the main line can keep working without interruption. Refrigeration protects ingredients, preparation furniture provides clean work surfaces, and washing equipment returns utensils and plates to use. Their space and connections should be established while the main kitchen is being drawn.
Full Equipment Range
Compare hotel cooking, refrigeration and washing equipment
Use these four ranges to review a hotel kitchen section by section. Cooking equipment covers the individual menu, gas and steam equipment handles bulk production, washing equipment deals with returns, and refrigeration supports storage and preparation. The specification should explain the relationship between those sections rather than presenting an unconnected list of appliances.
Cooking Ranges & Tandoors
Open-burner ranges, Chinese ranges, tandoors, griddles and deep fat fryers support a broad hotel menu. Select the combination for the dishes and peak service load, then coordinate the hot line with extraction and nearby preparation space.
View rangeGas Bank & Steam Cooking
Steam-jacketed kettles and tilting boiling equipment provide a separate route for stocks, gravies and bulk cooking. Their role becomes especially important when banquet batches would otherwise occupy the main restaurant ranges during normal service.
View rangeWarewashing
Hood-type, conveyor and under-counter dishwashers serve different washing requirements. We integrate the machine with pre-rinse provision, landing tables and pot washing, using the expected covers per hour to plan the surrounding working area.
View rangeRefrigeration & Cold Rooms
Walk-in cold rooms support stored stock while under-counter units keep preparation ingredients close to use. Display chillers, freezers, blast chillers and ice machines extend the cold equipment schedule where the hotel operation calls for them.
View range| Equipment | Typical size or spec | Price band |
|---|---|---|
| Four-burner cooking range | Four burners | From about ₹45,000 |
| Heavy Chinese range | Blower-equipped range | Above ₹1 lakh |
| Under-counter refrigerator | Under-counter format | From about ₹55,000 |
| Walk-in cold room | High-density PUF panels; grade 304 cladding | On quote |
| Hood-type dishwasher | Hood-type washing format | On quote |
| Steam-jacketed kettle | Bulk steam cooking | On quote |
| Preparation table | Grade 304 stainless steel | On quote |
| Cooking equipment category allowance | Basic tier; category total, not one appliance | ₹1 to 2 lakh |
Budget bands come from our published cost guide; individual starting figures are from our published equipment budgeting article. Category allowances are not prices for individual machines. Final prices follow the itemised quote.
What we build with
Our Work
Hotel kitchen installations in Bangalore and Mumbai
The linked work includes a 3000 sq ft five-star hotel kitchen in Bangalore and a 2800 sq ft hotel installation in Mumbai. The Bangalore project includes continuous exhaust hoods, a walk-in cold room and a hood-type dishwasher. The North Goa restaurant project offers a separate view of restaurant production within a resort setting.

Five-star hotel, Bangalore
Five-star hotel kitchen, 3000 sq ft, Bangalore. Cooking ranges, exhaust hoods, refrigeration, work tables, dishwashers. Timeline: 10 weeks from site visit to handover.
View project
Mumbai hotel, main and banquet kitchens
Five-Star Hotel Kitchen, 2800 sq ft, Mumbai. Cooking ranges, exhaust hoods, refrigeration units, work tables, dishwashers, bainmaries. Timeline: 8 weeks.
View project
Beach resort restaurant in North Goa
Beach Resort Restaurant Kitchen, 700 sq ft, Goa. Cooking ranges, exhaust hoods, refrigeration, prep tables, bar equipment, stainless steel furniture. Timeline: 5 weeks.
View projectSix-Stage Build Process
How should a hotel kitchen layout be planned?
- Bring the restaurant menu, banquet requirements and room-service brief together before deciding which stations can share equipment and which need their own capacity.
- At the site survey, we check the floor area and service points, then relate preparation, cooking, refrigeration and washing to the available routes.
- Review the proposed layout and itemised BOQ section by section, including extraction and washing, so the approved scope describes a complete working kitchen.
Follow the survey-to-installation sequence in our hotel kitchen installation process, or begin organising the available floor area with the kitchen layout configurator before discussing the detailed equipment brief.
Keep Reading
Hotel Kitchen Equipment List - Complete Setup Guide
A complete section-by-section equipment list for a full hotel kitchen, covering the main cooking line, banquet kitchen, pastry, cold kitchen and wash area with quantities by hotel size.
Read guideCommercial Kitchen Exhaust Hood Guide - Types, Sizing and Installation
A technical guide to commercial kitchen exhaust hoods, covering wall-mounted, island and proximity types, CFM sizing for different cooking loads, filter types and cleaning schedules.
Read guideCommercial kitchen cost guide (India)
Review hotel kitchen totals and category allowances before comparing the equipment schedule with your available budget.
What should buyers ask about hotel kitchen equipment?
What equipment does a full-service hotel kitchen need?
Have you installed hotel kitchens in Bangalore and Mumbai?
Should banquet cooking use the restaurant equipment?
How much should we allow for hotel kitchen equipment?

Looking for hotel kitchen equipment in India?
Let's build it right.
Site visit within 48 hours. Itemised BOQ in 5 working days.