Steelkraft installed a complete hotel kitchen for a five-star property in Mumbai. The project covered the main kitchen, banquet kitchen and cold storage across 2800 sq ft in the hotel's lower ground floor.

What did the client need from this kitchen?

The hotel required a complete kitchen overhaul before opening a new dining concept. The existing kitchen was undersized for the planned volume with inadequate exhaust ventilation and insufficient refrigeration capacity for the new menu.

How did we plan and build this five-star hotel kitchen in Mumbai?

Steelkraft visited the Mumbai property and conducted a full site survey before designing the layout. The new design separated the hot kitchen from the cold kitchen, added a dedicated banquet preparation zone and improved the wash-up workflow to handle 500 plus covers per service. Mumbai's high humidity and salt air environment required extra attention to material specification, so all equipment was fabricated in grade 304 stainless steel with additional surface treatment for coastal durability.

Equipment Installed

  • Four burner cooking ranges
  • Six burner cooking ranges
  • Commercial exhaust hoods with baffle filters
  • Two door vertical display chillers
  • Undercounter refrigeration
  • Stainless steel work tables with undershelves
  • Commercial dishwasher
  • Bainmarie counters
  • Pot wash sinks
  • Stainless steel storage racks and trolleys

What was the result of this five-star hotel kitchen in Mumbai?

The kitchen was installed and commissioned on time before the hotel's dining reopening. The new layout increased kitchen efficiency and the improved exhaust system eliminated heat and smoke issues that had affected service quality in the previous setup.

Questions about this hotel kitchen in Mumbai

How long did the installation take? The recorded project timeline is eight weeks. Installation and commissioning were completed before the hotel's dining reopening. The scope covered the main kitchen, banquet kitchen and cold storage together, rather than a replacement of cooking ranges alone.

How did the layout accommodate banquet preparation? The design separated hot and cold kitchen activities and introduced a dedicated banquet preparation zone. Wash-up planning addressed 500 plus covers per service, with a commercial dishwasher, pot wash sinks, storage racks and trolleys included in the equipment package.

What material was specified for the Mumbai environment? All equipment used grade 304 stainless steel with additional surface treatment for coastal durability. Refrigeration included two door vertical display chillers and undercounter units, while baffle-filter exhaust hoods served the cooking equipment.

Related: hotel kitchen equipment, commercial cooking equipment, commercial refrigeration, stainless steel work tables and sinks.

Planning a hotel kitchen with banquet and cold storage zones? Share your floor plan and covers per service.

Plan a Similar Kitchen
Get a Quote