Multi-Cuisine Restaurant Kitchen, Chennai
Multi-Cuisine Restaurant Kitchen · OMR, Chennai · 650 sq ft
Project Overview
On Old Mahabalipuram Road in Chennai, Steelkraft completed a restaurant kitchen installation for a 90 cover multi-cuisine restaurant serving North Indian, South Indian and Continental menus.
What did the client need from this kitchen?
The restaurant required a full kitchen setup within a 650 sq ft space on OMR with FSSAI compliance for Tamil Nadu food service regulations. The menu required separate cooking lines for Indian and Continental cuisine with adequate refrigeration for fresh ingredient storage.
How did we plan and build this multi-cuisine restaurant kitchen in Chennai?
Steelkraft visited the Chennai restaurant space and designed a layout with two parallel cooking lines, one for Indian cuisine with tandoor and bulk cooking equipment and one for Continental with griddle and salamander. The OMR restaurant corridor has strict CMDA guidelines for commercial kitchen exhaust, so Steelkraft designed the exhaust system to comply fully with Tamil Nadu FSSAI requirements.
Equipment Installed
- Four burner cooking ranges
- Commercial tandoor
- Continental cooking line with griddle and salamander
- Exhaust hoods
- Two door display chillers
- Undercounter refrigeration
- Stainless steel prep tables
- Commercial dishwasher
- Glasswasher
- Pot wash sink and stainless steel furniture
What was the result of this multi-cuisine restaurant kitchen in Chennai?
The kitchen was installed and commissioned within five weeks. The FSSAI inspection passed without any observations and the restaurant opened on schedule. The dual cooking line layout allowed the kitchen team to run both menus simultaneously during peak service without congestion.
Questions about this restaurant kitchen installation in Chennai
How did the kitchen accommodate different cuisines? Two parallel cooking lines divided the work. The Indian line included tandoor and bulk cooking equipment, while the Continental line used a griddle and salamander, so both menus could run together at peak service.
Did the supply include refrigeration and washing equipment? The package covered two door display chillers, undercounter refrigeration and stainless steel prep tables as well as the cooking appliances. A commercial dishwasher, glasswasher and pot wash sink handled washing.
What completion period is documented for this OMR restaurant? Installation and commissioning took five weeks, and the restaurant opened on schedule. The recorded outcome also states that the FSSAI inspection passed without observations.